Total Scour Analysis for Bank Protection

About the Tutorial

This tutorial provides a step-by-step procedure in evaluating the total scour to provide toe-down protection for bank structures.

Procedure

The procedure involves the consideration of six (6) scour components that includes the following:

  • Bed-Form
  • Bend Scour
  • General Scour
  • Local Scour
  • Long-Term Scour
  • Low-Flow

The procedure also demonstrates the use of appropriate safety factors.

Related Documents and Files